ACCA P3 考试:PERFORMANCE INDICATORS 4

PERFORMANCE MEASURES-A PRACTICAL FRAMEWORK

Expanding on the last point, above, to establish a performance measurement system, something like the following is needed for each measure:

1.A meaningful title of the measure

2.What is its purpose and how does that purpose relate to strategic success?

3.What other performance measures might be affected by this one, how are they affected and how are conflicts to be resolved?

4.Who will be held responsible for it?

5.What is the source data, who is responsible for its supply, how is it measured and how is the measure calculated?

6.What investigations and explanations are required and who is responsible?

7.What target is set and how has that target been determined?

8.How often should the target be updated?

9.How often is the measure reported on?

10.Reporting and action?

For example, consider a passenger train company called TTTE:

1.Title of performance measure
Punctuality (the percentage of trains arriving at their destination on time).
2.Purpose of performance measure
TTTE’s strategic objective is to provide comfortable, reliable and punctual services to passengers. TTTE competes with other train companies, cars, buses and airlines. Punctuality is seen as a key competitive lever and therefore must be measured.
3.Other performance measures affected
Safety – safety checks and speed limits will take priority over punctuality
Cleanliness – it might be necessary to occasionally reduce cleaning to keep to the timetable.
Energy consumption running a train faster than normal (though within speed limits) will cause higher fuel consumption but punctuality takes precedence.
4. Who is held responsible?
Operations director.
5.Source data, measurement and calculation of the measure.
The duty manager at each station is responsible for logging the arrivals time of each train. A five-minute margin is allowed ie a train is logged ‘on time’ if it is no later than 5 minutes after the advertised time. Beyond five minutes the actual time by which the train is late is logged. Results will be calculated in percentage bands: on time, up to 15 minutes late, >15–30 minutes late, >30 minutes – one hour late, >one hour late, and so on.
6.Investigations and explanations
While logging late arrivals, station duty managers should also note the cause where possible. The operations director must collate this information using statistical analysis which highlights persistent problems such as particular times of the day, routes or days of the week.
7. Target and how it is determined
The target is dictated by the railway timetable. The timetable should be reviewed twice a year to look for ways of reducing journey times to keep TTTE competitive with improvements in competing transport.
8. Update of target
The banding and any tolerances will be updated annually.
9. How often should the measure be reported
Weekly
10. Reporting and action
The operations director will report performance on a monthly basis to the board together with plans for service improvement.

我要纠错】 责任编辑:小莹子

免费试听

  • Jessie《FR 财务报告》

    Jessie主讲:《FR 财务报告》免费听

  • 张宏远《MA 管理会计》

    张宏远主讲:《MA 管理会计》免费听

  • 何 文《SBL 战略商业领袖》

    何 文主讲:《SBL 战略商业领袖》免费听

限时免费资料

  • 近10年A考汇总

    历年样卷

  • 最新官方考试大纲

    考试大纲

  • 各科目专业词汇表

    词汇表

  • ACCA考试报考指南

    报考指南

  • ACCA考官文章分享

    考官文章

  • 往年考前串讲直播

    思维导图

回到顶部
折叠
网站地图

Copyright © 2000 - www.fawtography.com All Rights Reserved. 北京正保会计科技有限公司 版权所有

京B2-20200959 京ICP备20012371号-7 出版物经营许可证 京公网安备 11010802044457号