24周年

财税实务 高薪就业 学历教育
APP下载
APP下载新用户扫码下载
立享专属优惠

安卓版本:8.7.31 苹果版本:8.7.31

开发者:北京正保会计科技有限公司

应用涉及权限:查看权限>

APP隐私政策:查看政策>

HD版本上线:点击下载>

IAS 37 Provisions, Contingent Liabilities and Contingent Assets

来源: 正保会计网校 编辑: 2015/06/02 13:59:01 字体:

ACCA P3考试:IAS 37 Provisions, Contingent Liabilities and Contingent Assets

1. Objective

To ensure that appropriate recognition criteria and measurement bases are applied to: 

provisions;

contingent liabilities; and

contingent assets.

To ensure that sufficient information is disclosed in the notes to the financial statements in respect of each of these items.

2. Scope

The rules will apply to all provisions and contingencies except for those covered by more specific requirements in other IFRSs. For example:

IAS 11 Construction Contracts;

IAS 19 Employee Benefits;

IAS 12 Income Taxes

IAS 17 Leases; and

IFRS 3 Business Combinations.

3. Terminology

Provisions: liabilities of uncertain timing or amount.

Liability: a present obligation of the entity arising from past events, the settlement of which is expected to result in an outflow from the entity of resources embodying economic benefits.

Obligating event: an event which creates a legal or constructive obligation which results in an entity having no realistic alternative to settling that obligation.*

Legal obligation: an obligation which derives from:

a contract;

legislation; or

other operation of law.

Constructive obligation: an obligation which derives from an entity's actions where:

by an established pattern of past practice, published policies or a sufficiently specific current statement, the entity has indicated to other parties that it will accept certain responsibilities; and as a result, the entity has created a valid expectation on the part of those other parties that it will discharge those responsibilities.

Contingent liability:

a possible obligation which arises from past events and whose existence will be confirmed only on the occurrence or non-occurrence of one or more uncertain future events, which are not wholly within the control of the entity; or

a present obligation which arises from past events but is not recognised because:

— it is not probable that an outflow of benefits embodying economic benefits will be required to settle the obligation; or

— the amount of the obligation cannot be measured with sufficient reliability.*

Contingent asset: a possible asset which arises from past events and whose existence will be confirmed only on the occurrence or non-occurrence of one or more uncertain future events not wholly within the control of the entity.

Onerous contract: a contract in which the unavoidable costs of meeting the obligations under the contract exceed the economic benefits expected to be received from it.

Restructuring: a programme which is planned and controlled by management, and materially changes either:

= the scope of a business undertaken by an entity; or

= the manner in which that business is conducted.

4. Relationship Between Provisions and Contingent Liabilities

In a general sense, all provisions are contingent because they are uncertain in timing or amount.

The standard distinguishes between:

provisions, which are present obligations; and

contingent liabilities, which are not recognised because they are either:

— only possible obligations; or

— present obligations, which cannot be measured with sufficient reliability.

我要纠错】 责任编辑:蓝色天空

免费试听

  • Jessie《FR 财务报告》

    Jessie主讲:《FR 财务报告》免费听

  • 张宏远《MA 管理会计》

    张宏远主讲:《MA 管理会计》免费听

  • 何 文《SBL 战略商业领袖》

    何 文主讲:《SBL 战略商业领袖》免费听

限时免费资料

  • 近10年A考汇总

    历年样卷

  • 最新官方考试大纲

    考试大纲

  • 各科目专业词汇表

    词汇表

  • ACCA考试报考指南

    报考指南

  • ACCA考官文章分享

    考官文章

  • 往年考前串讲直播

    思维导图

回到顶部
折叠
网站地图

Copyright © 2000 - www.fawtography.com All Rights Reserved. 北京正保会计科技有限公司 版权所有

京B2-20200959 京ICP备20012371号-7 出版物经营许可证 京公网安备 11010802044457号